Tumbalong Green Stage in Darling Harbour, Sydney is halfway through.
Our sales and client manager Mareks Balodis crossed the ocean to check upon timber structures on the construction site. Earlier this year ZAZA TIMBER manufactured and shipped 281 curved glulam structures with steel couplings embedded for the project. In total 94 m3, strength class 28h and 30c.
Client: Theca Timber Australia.

Mareks Balodis, Head of Sales at ZAZA TIMBER is about to examine the quality of timber structures after transportation.