ZAZA TIMBER recently manufactured and assembled a 52-metres long pedestrian overpass over the road. It is made of 121 m3 glued laminated timber and 31 m3 CLT.
The overpass consists of three parts. Each part (aprox. 17-metres long) was pre-assembled on a truck platform and transported to the construction site in one piece. Manufacturing and pre-assembly was done at the ZAZA TIMBER factory to enable easy assembly on the construction site.
- Location: Salaspils, Latvia.
- Architect: Vents Grietēns
- Glulam manufacturing, calculation of connections, and timber structure assembly: ZAZA TIMBER
- The project was implemented in cooperation with the general contractor: “SHENBERG” SIA