We use statistics cookies, no advertising.
Agree
Disagree
LV
Engineering
Production
Construction
Selected works
Contacts
Our passion
News
About us
LV
News
We have finished works on the timber facade and two skylights for “Aker Tech House” in Norway
31.05.2023.
ZAZA TIMBER begins assembly of TZMO logistics center; manufactures 550 m3 glulam
30.05.2023.
Project evolution – timber canopies for electric car charging stations
24.04.2023.
ZAZA TIMBER finishes assembly of a 65-metre long timber bridge in Sweden
24.02.2023.
ZAZA TIMBER manufactures and assembles a 65 m long timber bridge in Linköping, Sweden
29.12.2022.
A timber bridge designed and manufactured by ZAZA TIMBER built over the Vircava in Latvia
28.10.2022.
Timber bridges – glulam manufacturing projects
24.10.2022.
ZAZA TIMBER receives Sentralt godkjent approval
07.10.2022.
ZAZA TIMBER triples its turnover and improves profit indicators, increasing its activity in export markets
25.08.2022.
ZAZA TIMBER Construction receives ISO 9001:2015 sertificate
20.07.2022.
ZAZA TIMBER Builds EV Charging Stations in Køge, Odense and Esbjerg, Denmark.
18.05.2022.
Meet us at the NORDBYGG, April 26-29, Stockholm
29.03.2022.
1
2
3
4